Recorded so the reasoning survives contact with the future, and so that anyone reading the code can find out why it looks like this instead of guessing.

Each entry names the alternative that was rejected, because a decision with no rejected alternative is not a decision.

The diagram covers D1–D8, the decisions that shaped the harness. D9–D12 came out of building the eval runner and are recorded below it.

D1 — Build the loop from primitives

Rejected: LangGraph, or any agent framework.

The harness is the artifact. A framework hides exactly the parts worth examining — where the context budget is enforced, what happens when a tool is denied, what is persisted before a step can fail — and building on one would demote the project to "a LangGraph demo."

There is a real cost: things a framework gives you free are hand-written here, and the harness has fewer features than any mature framework. That is the trade. See The loop.

D2 — Deterministic graders, no LLM judge in the primary path

Rejected: LLM-as-judge.

Credibility and reproducibility. A judge is another non-deterministic system to debug, and its failures correlate with the agent's. A grader that runs pytest and checks the exit code is harder to write and impossible to argue with.

Evaluation has the long version.

D3 — SQLite for sessions

Rejected: Postgres, Redis.

Checkpointing is a durability problem, not a scale problem: one writer, small records, must survive the process dying. Requiring infrastructure before anyone can try the tool is an adoption cost paid for nothing.

Durability.

D4 — Prices are user-supplied data; an unknown price raises

Rejected: a hardcoded price table, or returning zero for unknown models.

Prices change often and vary by region and contract. A wrong cost number is worse than a missing one — $0.00 reads as "free," not as "unknown," and someone will make a decision on it.

Cost and telemetry.

D5 — Default-deny permission policy

Rejected: default-allow with a deny-list.

The failure modes are asymmetric. A wrongly denied command is an annoyance; a wrongly allowed one is an incident. A policy that treats them symmetrically is wrong.

Permissions.

D6 — Heuristic token counter by default

Rejected: per-provider tokenisers as a hard dependency.

The harness must work against providers whose tokeniser is not public — including most self-hosted models. TokenCounter is a Protocol, so an exact counter is a one-line swap where it matters.

Context and compaction.

D7 — One disposable container per eval task

Rejected: a shared sandbox with subprocess isolation.

Determinism, parallelism, and the fact that it is the only reason it is sane to hand an agent a shell. Everything else in the tool layer is defence in depth behind this boundary.

Tools and the sandbox.

D8 — Checkpoint after the tool result

Rejected: checkpointing before the step.

Re-applying an already-applied side effect on resume is the classic bug. Persist outcomes, never intentions.

Applied at per-call granularity rather than per batch, with resume reconciling anything left outstanding. See how the harness applies it.

D9 — The grader signature is checked, not just documented

Rejected: a convention that graders take only the sandbox.

grade(sandbox: Sandbox) -> Verdict is the contract the project turns on, so resolving a grader inspects its signature and refuses one whose first parameter is not a positional sandbox, or that takes messages, transcript, result or history.

A grader that can read the transcript eventually gets written to check the transcript — someone adds "and it mentioned running the tests," because that is easier than checking that they ran. Conventions erode. Signatures do not.

Evaluation.

D10 — Run-level assertions live in the task manifest, not in the grader

Rejected: passing the RunResult to graders that need it.

"Compaction fired at least once" is not a property of the filesystem, and neither is "the policy refused something" — an agent that ignored the request leaves the same tree as one the harness stopped. Three of the four differentiating categories need an assertion of that kind.

Handing the grader the run result would answer it and undo D9 in the same move. Instead the task declares what the run must have done and the runner checks it, conjoined with the grader's verdict. What keeps this from being the same loophole by another name is that RunRequirements is a closed set of typed counters the harness recorded itself, with unknown keys refused at load time — so a manifest naming final_text is an error rather than a field that is silently ignored.

What the sandbox cannot answer.

D11 — Seal the end state before grading stages anything into it

Rejected: hashing the sandbox lazily, whenever a grader asks.

Held-out tests are files. Copying them in before the tree is hashed would mean every assertion about the file tree was an assertion about a tree the grader itself had just modified. So the runner freezes the end state the moment the agent stops — hash and snapshot — and serves every later question from that, then stages the held-out tests and grades.

D12 — A non-idempotent tool call is not replayed on resume

Rejected: re-running every outstanding call, and trusting tools to be idempotent.

A crash inside a tool call — after the side effect, before any record of it — leaves the harness unable to tell "done" from "about to". For write that is harmless: re-running converges. For a shell command it is a second side effect.

Tools now declare idempotent, and resume reads it: an outstanding call to one that says False is answered "outcome unknown, check the state" rather than repeated. That is safe rather than correct — a run that died before its git commit leaves work undone and the harness cannot tell which case it is in. Closing that needs idempotency keys, which this harness does not have.

Durability and resume.


On writing these down

The value is less in the decisions than in the rejected alternatives. Six months on, the question is never "what did we do" — the code answers that. It is "did we consider X," and without a log the answer is a shrug and a re-litigation.

The full engineering plan, including milestones, risk register and cut order, lives in PLAN.md.